Automatic version control
You attach the new version to the original document, so the latest revision is always clear.
All plansWe always use the storage the site needs to work. Analytics and marketing cookies are switched on only if you agree. You can change your choice at any time with Cookie settings in the footer. Cookie policy
Drawing versions and revisions
Keep drawing versions together, compare revisions and check which drawing is valid to use. myPlan.cloud's automatic version control helps you stay on top of a project's changing drawings.

Sound familiar?
The file name says final, yet another version arrives. When revisions are handled separately across the team, it's hard to tell what changed and which drawing the site should work from.
Drawing version control keeps the successive versions of the same drawing in one history and shows what changed between them. “Latest” is about time, “approved” is a decision: myPlan.cloud tracks both, so the team doesn't have to guess from the file name which drawing is valid.
File-name chaos
When only the file name tells revisions apart, nobody knows for sure which is the latest, what changed in it, and whether the site may work from it yet.
Drawing register
A new version is attached to the original document. The drawing register shows at a glance which revision is the latest, when it was issued and whether it is approved.

Comparison
The comparison lays the two versions over each other and colours the differences: red for what is only on the earlier drawing, teal for what is only on the later one. You check just the parts that changed.

Latest ≠ approved
A new revision waits until the people entitled to approve it have done so. Until then the last approved version stays valid, which is why myPlan.cloud shows the version and the status separately.
Approval workflow · Drawing release
Until then rev2 stays valid
QR code on site
Drawing sheets carry a QR code. Scanned with the mobile app, it shows at once whether the printed sheet is the approved, current revision or a newer one exists (in the Pro and BIM plans).
Tell us about your project, and we'll walk you through how myPlan.cloud fits the way your team works.
The solution
Revision history, comparison and status – on the same document.
You attach the new version to the original document, so the latest revision is always clear.
All plansExamine the differences between versions; highlighted changes help you check the modified areas in a targeted way.
All plansSee all of the project's drawings and their current versions in one list.
All plansComments are recorded next to the drawing with markups; review and approval can be tracked.
Review: Pro and BIM plansScan the QR code on the drawing sheet with the mobile app to see its current approval status.
Pro and BIM plansThe activity log shows when a drawing was issued, who approved it and when.
How it works
A new version arriving doesn't mean it's ready for construction. Issuing the drawing, reviewing the change and deciding whether it can be used are best handled as separate steps.

FAQ
The latest drawing is the most recently uploaded version. The approved drawing is the version accepted by the participant authorised to approve it. They can differ, so myPlan.cloud shows version and status separately.
Yes. Document comparison is available in every plan and highlights the differences between versions.
The QR code on the drawing sheet can be scanned with the mobile app to show its current approval status (Pro and BIM plans).
Document management is about organising files and access; version control tracks the versions of the same drawing. In myPlan.cloud both work in one system.
Book a free online demo: using two anonymised drawing versions, we'll show how it would work on your projects.
Tell us about your project, and we'll walk you through how myPlan.cloud fits the way your team works.
Related workflows