Skip to content

Drawing versions and revisions

Drawing version control: see what changed on the drawing.

Keep drawing versions together, compare revisions and check which drawing is valid to use. myPlan.cloud's automatic version control helps you stay on top of a project's changing drawings.

Comparing drawing versions with highlighted differences
  • Built with the backing of a construction group
  • Runs in the browser, no installation
  • Mobile app for offline work

Sound familiar?

“Final_​v3_​revised” – which one are we working from?

The file name says final, yet another version arrives. When revisions are handled separately across the team, it's hard to tell what changed and which drawing the site should work from.

How does drawing version control help?

Drawing version control keeps the successive versions of the same drawing in one history and shows what changed between them. “Latest” is about time, “approved” is a decision: myPlan.cloud tracks both, so the team doesn't have to guess from the file name which drawing is valid.

File-name chaos

Final, final_v2, final_v3_fixed.

When only the file name tells revisions apart, nobody knows for sure which is the latest, what changed in it, and whether the site may work from it yet.

  • Floor-plan_final.pdf Email attachment
  • Floor-plan_final_v2.pdf Shared drive
  • Floor-plan_final_v3_fixed.pdf Group chat
  • Which one do we build from? A new revision could arrive without anyone knowing

Drawing register

Every drawing and every revision in one table.

A new version is attached to the original document. The drawing register shows at a glance which revision is the latest, when it was issued and whether it is approved.

The myPlan.cloud drawing register: drawings by number, with the latest and earlier revisions and their status
Latest revision In its own column for every drawing
Pending approval
Rejected

Comparison

See at once what changed between two revisions.

The comparison lays the two versions over each other and colours the differences: red for what is only on the earlier drawing, teal for what is only on the later one. You check just the parts that changed.

Drawing comparison in myPlan.cloud: two revisions overlaid, with the differences between the earlier and later drawing highlighted in colour
Four views Clouds, pixel highlight, side by side, slider
Only on the later drawing
Only on the earlier drawing

Latest ≠ approved

Uploaded does not mean ready to build.

A new revision waits until the people entitled to approve it have done so. Until then the last approved version stays valid, which is why myPlan.cloud shows the version and the status separately.

Approval workflow · Drawing release

  1. DesignerUploads rev3
  2. Technical supervisorApproves
  3. Project managerPending approval
  4. Release to siteAutomatic, once approved

Until then rev2 stays valid

QR code on site

Scan the sheet and know if it is valid.

Drawing sheets carry a QR code. Scanned with the mobile app, it shows at once whether the printed sheet is the approved, current revision or a newer one exists (in the Pro and BIM plans).

Scanning QR code…
Superseded Shows which revision to use instead
Pending approval Latest revision, not yet approved
Approved, current Latest revision, approved

See it on your own project

Tell us about your project, and we'll walk you through how myPlan.cloud fits the way your team works.

Book a demo

The solution

The latest drawing and the approved drawing are two different questions.

Revision history, comparison and status – on the same document.

  • Automatic version control

    You attach the new version to the original document, so the latest revision is always clear.

    All plans
  • Drawing comparison

    Examine the differences between versions; highlighted changes help you check the modified areas in a targeted way.

    All plans
  • Drawing register view

    See all of the project's drawings and their current versions in one list.

    All plans
  • Markups and design review

    Comments are recorded next to the drawing with markups; review and approval can be tracked.

    Review: Pro and BIM plans
  • QR code checks on site

    Scan the QR code on the drawing sheet with the mobile app to see its current approval status.

    Pro and BIM plans
  • Searchable drawing history

    The activity log shows when a drawing was issued, who approved it and when.

How it works

How it works on a project

A new version arriving doesn't mean it's ready for construction. Issuing the drawing, reviewing the change and deciding whether it can be used are best handled as separate steps.

  1. Link the new revisionUpload the new drawing as the next version of the existing document.
  2. Check the differencesCompare the versions and review the changes that affect construction.
  3. Agree on the valid drawingStatus and the approval workflow decide what the team can work from.
A drawing sheet from the project's drawing register

FAQ

Questions about drawing version control

What's the difference between the latest and the approved drawing?

The latest drawing is the most recently uploaded version. The approved drawing is the version accepted by the participant authorised to approve it. They can differ, so myPlan.cloud shows version and status separately.

Can I compare two drawing versions?

Yes. Document comparison is available in every plan and highlights the differences between versions.

How does the site know it's working from the right drawing?

The QR code on the drawing sheet can be scanned with the mobile app to show its current approval status (Pro and BIM plans).

How is this different from document management?

Document management is about organising files and access; version control tracks the versions of the same drawing. In myPlan.cloud both work in one system.

How do we get started?

Book a free online demo: using two anonymised drawing versions, we'll show how it would work on your projects.

See it on your own project

Tell us about your project, and we'll walk you through how myPlan.cloud fits the way your team works.

Book a demo

No more “final_​v3_​revised”.